It was a move to remember for life. Willi Tobler, Panalpina’s global head of transport engineering for Energy and Project Solutions talks in more detail about the challenges he and his team faced when a 76 ton subsea tree for an oil and gas customer had to be loaded onto an Antonov-124 in Malaysia. The tree’s final destination was on the seabed of a gas field located off the coast of Trinidad.