Follow Panalpina

Blog posts 2 hits

72 hours at each port

72 hours at each port

Blog posts   •   Jul 05, 2017 09:00 GMT

Between December 2015 and June 2016, the Glen Lyon traveled 15,600 nautical miles in total, traveling at an average speed of 6.4 knots first from South Korea to Norway and then onwards to its permanent location west of the Shetland Islands. Panalpina assisted BP with the tow of the FPSO Glen Lyon by taking charge of responsibilities such as material management, husbandry and ship agency services.

Trouble in Happy Valley-Goose Bay

Trouble in Happy Valley-Goose Bay

Blog posts   •   Dec 22, 2016 11:00 GMT

With the 76 ton subsea tree successfully loaded and secured in the hold beneath him, loadmaster Yrii Rudko’s job was done for now. Sitting in the cabin at the back of the An-124, seat belt fastened, he could feel how 400 tons of mighty flying equipment and cargo accelerated down runway 34 at Senai International Airport in Malaysia. This is part III of Panalpina's "Christmas tree" story.

Images 2 hits

The route of the Glen Lyon

The route of the Glen Lyon

License © All rights reserved (allow download)
Download
Size

2.83 MB • 3509 x 2481 px

Airlift with 10 tech stops

Airlift with 10 tech stops

License © All rights reserved (allow download)
Photographer / Source Panalpina
Download
Size

4.26 MB • 3509 x 2481 px